Case Study on Ultra Mega Power Project (UMPP) of India

Introduction: The first Ultra Mega Power Project (UMPP) of India, Mundra UMPP worth INR 18,000 Cr. only was awarded to Tata Power. The project had 5 units of 800 MW each, generating a total of 4,000 MW using supercritical technology and 40,000 MT /day imported coal. TCE Limited, Bangalore was appointed as engineering consultant to Tata Power. Strong pre-tendering by KBL helped to win the order of 10 CVP’s from TCE.

Case Study on Ultra Mega Power Project (UMPP) of India

Challenge: The project challenge was design, manufacture, erect and commission 10 Nos. of CVP’s for sea water application. Supply, erect and commission 10 Nos. of 5200 kW, 22 poles, 11 kV, 271 RPM HT motors of BHEL. Design, supply, erect and commission cooling water system for motors, pump bearings and pump sealing. Design, supply, erection and commissioning of field instrumentation like VMS, RRI, Key Phasor, Transmitters, Flow Switches was also one of the major challenges. Click here to read more…

Register to mark your Comments

Comments

Filed under Assorted, Industry Specific Cases