Compañía Minera Teck Quebrada Blanca’s pipeline system is designed to transport copper concentrate from the concentrator to the Punta Patache Norte port facilities area. The system will include a copper concentrate pipeline, make-up and reclaim water system, and tailings transport system. Ausenco PSI was selected to perform a pre-feasibility study update in Phase 1 of the project and a cost-saving engineering feasibility study in Phase 2. View more on Quebrada Blanca Hypogene Expansion
